Details: construction of subgrade and earthen shoulder with approved material obtained from borrow pits with all lifts and lead ,transporting to site ,spreading ,grading to required and compacted to meet requirement of table no. 300-2 excavation in soil with dozer with lead upto 100 metres excavation for road way in soil by mechanical means including cutting and pushing the earth to side of embankment upto a distance of 100 m (average lead 50 mtr),including trimming bottom and side slopes in accordance with requirement of lines,grades and cross section earthwork in excavation of foundation of structure as per drawing and technical specification,including setting out ,construction of shoring and bracing,removal of stumps and other deleterious matter,dressing of sides and bottom,backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work ordinary soil (b)
Sector: Road development