Description: -ARM 1:ARM work (Civil)-Non Residential building (As per the detailed BOQ placed at Annexure I of the Scope of work document); ARM 2:ARM work (Civil)-Residential building (As per the detailed BOQ placed at Annexure II of the Scope of work document); ARM 3:ARM WORK(Electrical)- Non-Residential building (As per the detailed BOQ placed at Annexure III of the Scope of work document); ARM 4:ARM WORK(Electrical)- Residential building (As per the detailed BOQ placed at Annexure IV of the Scope of work document); ARMO: Operation Manpower for ARMO works (As per the detailed BOQ placed at Annexure V of the Scope of work document), to be quoted as per latest CLC rates in force including contractor overhead, as illustrated at Wage calculation sheet. ; Pump set maintenace:AMC of Pump sets with Quarterly maintenace as per the Scopw of work enclosed with the Bid document placed at Annexure VI; DG set maintenance:AMC of DG sets with Quarterly maintenace as per the Scopw of work enclosed with the Bid do
Details: ARM 1 , ARM 2 , ARM 3 , ARM 4 , ARMO , Pump set Item Category/ maintenace , DG set maintenance
Sector: Labour and Employment