Details: epc basis for design ,engineering, supply, & installation along with commissioning of sewage treatment plant by septic tank elimination project (step) in rcc -sewage treatment plant with 1 working & 1 standby equipment with auto & manual system & timer arrangement inside dnpl township .the sewage treatement shall be based on mbbr technology. the nature of effluent is domestic sewage from toilets and kitchen areas which shall be discharged into the stp. the scope shall include design and execution of all electrical, mechanical, plumbing, processing, ancillary equipments and works etc required to complete the package along with getting approval from the state pollution control board, other statutory bodies as well as from the design consultant. and the design to be approved by competent authoritythe scope also includes the design & installation / modification of civil structures if required for the system considering the structural elements. design to take consideration as per the co
Sector: Industry Development