Details: pile load test on single vertical pile in accordance withis:2911(part-iv).a). initial and routine load test br. no. 1/1 13th km of dm road near zin-fed ltd. to bonglong timung village (span 1 x 40) pile load test on single vertical pile in accordance withis:2911(part-iv).b. (lateral load test) br. no. 1/1 13th km of dm road near zin-fed ltd. to bonglong timung village (span 1 x 40) pile integrity test. integrity testing for all piles by using pile driving analyser or equivalent as approved by engineer in charge and detailed in specification. test to be carried out by an approved reputed agency. item to include all incidental work to execute the jobbr. no. 1/1 13th km of dm road near zin-fed ltd. to bonglong timung village (span 1 x 40) bored cast-in-situ m35 grade r.c.c. pile excluding reinforcement complete as per drawing and technical specifications and removal of excavated earth with all lifts and lead upto 1000 m. (pile diameter-1200mm)br. no. 1/1 13th km of dm road near
Sector: Road development