Details: providing and constructing temporary island for construction of pile foundation with depth of water upto 4.0m complete as per technical specificationbr. no. 3/1 on road from saraspur to leverputa pt-ii via khelma pt-ii (lamagram) (span 2 x 25) pile load test on single vertical pile in accordance withis:2911(part-iv).a). initial and routine load test br. no. 3/1 on road from saraspur to leverputa pt-ii via khelma pt-ii (lamagram) (span 2 x 25) pile load test on single vertical pile in accordance withis:2911(part-iv).b. (lateral load test) br. no. 3/1 on road from saraspur to leverputa pt-ii via khelma pt-ii (lamagram) (span 2 x 25) pile integrity test. integrity testing for all piles by using pile driving analyser or equivalent as approved by engineer in charge and detailed in specification. test to be carried out by an approved reputed agency. item to include all incidental work to execute the jobbr. no. 3/1 on road from saraspur to leverputa pt-ii via khelma pt-ii (lamagram) (span 2 x
Sector: Road development