Details: road works clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness asper technical specification clause 201.(ii) by mechanical means(a) in area of non-thorny jungle excavation in marshy soilexcavation for roadway in marshy soil with hydraulic excavator 0.9 bucket capacity including cutting and loading in tippers and disposal with a lift upto 1.5m and lead upto 1000 m, trimming of bottom and side slopes in accordance with requirements of lines, grades and cross- sections as per technical specificationclause 302.3.6. construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to re
Sector: Road development