Description: M and R to protect Budlabheta and its adjoining areas from the erosion of river Doomdoma for 2024 25 Name of Work M R to protect Budlabheta and its adjoining areas from the erosion of river Doomdoma for 2024 25
Details: Earthwork in bank trimming to the designed section / by mechanical means including removing the trimmed soils to a minimum distance of 30 m, complete as directed. Carriage of PSC porcupine members of size 0.10m X 0.10m X 3.00m from WRD Central store to Rupai saiding, Doomdooma Tinsukia including loading, unloading & stacking, 530 km Carriage of PSC porcupine members of size 0.10m X 0.10m X 3.00m from Stack yard to Work Site including loading, unloading & stacking Labour charge for launching of PSC Porcupine including carriage of PSC porcupine members of size 0.10 m × 0.10 m × 3.00 m from the stack yard to the place of launching, of the Porcupine with 6 (Six) members properly, supply & fitting/fixing with 12 mm dia. 25 Cm long M.S. Nuts and bolts and launching the porcupine properly as directed. (Lead up to 150 m) Launching with boat Labour charge for launching of PSC Porcupine including carriage of PSC porcupine members of size 0.10 m × 0.10 m × 3.00 m from the stack yard to the pla
Sector: Water Resource Department