Description: INSTALLATION OF SOLAR OPERATED STW 5 POINTS AT RANGIA LAC UNDER SOPD G FOR THE YEAR 2024 25 Name of Work INSTALLATION OF SOLAR OPERATED STW 5 POINTS AT RANGIA LAC UNDER SOPD G FOR THE YEAR 2024 25
Details: DTW Boring of DTW :- Boring of DTW of bore hole up to 450 mm dia and up to a depth of 45 M or up to required depth by RC/DR Drilling Rig including supply and transportation of all required Tools & Plants, materials & Labour to site to perform the job in complete as directed in alluvium areas (means areas where the strata comprises of loose, unconsolidated materials like clays, silts, sands gravels, pebbles, cobbles and boulders) as per IS: 2800 (part-I) of 1991. ( Soil sample must be collected & keep properly at every 3.00 M interval of depth in boring. The job also include movement of Rig by making temporary approach road etc. to the field up to distance of 1000 M.) Supply & Lowering, etc. of Pipes :- Supply, lowering & installation in tube well 150 mm PVC housing pipe / blind pipe of wall thickness of 6.5 mm to 8.5 mm for casing assembly including supply of well cap, sockets, reducer, MS housing clamps etc. as required as per IS : 12818-1997 of
Sector: Irrigation