Details: scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3.0m and lead upto 1000 m as per technical specification clause 301.4. (i) excavation in cutting in soil by manual means with lead upto 50 m . excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per technical specification clause 302.3 (manual method should be adopted where machines can not be deployed due to site condition) construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required and compacting to meet requirement of tables 300.1 and 300.2 with a lead upto 1000 m as per technical specification clause 301.5(i) private land for raising in submerged portion construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transpor
Sector: RDPR