Details: road works heavy dressing of the existing road including dressing high spots and filling low spots, cambering, watering, rolling with 8 to 10 tonne roller to obtain a specified compaction etc. to obtain a uniform formation surface with cross fall from the road centre line to the outer shoulder edge with allowance, made for required quantity of shoulder materials to remain in place to contain the new gravel layer. works to be carried out in accordance with technical specification and as directed by the engineer. construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required and compacting to meet requirement of tables 300.1 and 300.2 with a lead upto 1000 m as per technical specification clause 301.5 (ii) from private land construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required
Sector: Road development