Details: setting up of waste to compost facility waste to compost plant of capacity ... tpd as per specification mentioned at annexure-ix of rfp document. setting up of material recovery facility material recovery facilityof capacity ….... tpd as per specification mentioned at annexure-ix of rfp document. design, development of sanitary landfill setting up of secured landfill of volume 3421.88 m3, as per specification given in the design. annual maintenance cost (amc) amc for the period of (5) years for the supplied technologies, machineries, tools & equipment. operation and maintenance (o&m) o & m for the period of (5) years for the entire project
Sector: Urban Authority