Details: 2.8 earth work in excavation by mechanical means (hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. 16.12 dry brick pitching half brick thick in drains including supply of bricksand preparing the surface complete16.12.1 with common burnt clay f.p.s. (non modular) bricks of class designation 7.5 4.1providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work up to plinth level :a) in proportion 1 : 3 : 6 5.22 steel reinforcement for r.c.c. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.5.22a.6 thermo-mechanically treated bars of grade fe-500d or more . 5.22steel reinforcement for r.c.c. work including straigh
Sector: Water supply and Sewerage