Details: painting two coats on concrete surfaces (painting two coats after filling the surface with synthetic enamel paint in all shades on plastered concrete surfaces) after cleaning scraping etc. as per technical specifications.) maintenance of shoulder: coarse graded material (table:- 400- 2) construction of granularshoulder by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at omc, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.grading iii material tree fall clearance: cutting of branches of trees and shrubs from the road way or with in r.o.w. including disposal of wood and leaves to suitable location as per technical specification clause 1914. trimming of grass and weeds from the shoulders/berms and disposing off the same to suitable locations as per technical specifications clause 1914. maintenance of culverts slab type (maintenance of slab ty
Sector: Road development