Details: 1. construction of embankment3.4 constructon fo embankmenr with approved meterials obtained from borow p[its with all lift and leads transpotting to site spreding grading to required and compactoing to meet requirment of table 300-2 (including compensation of earth) ( including cost of testing of materials at site and laboratory as directed by the deptt.)(a) from privat land collection and supply of sand gravel containing 60% sand and 40% gravel at quarry free fromn disntegrated and flaky pieces vegetation or other dileterious matter and addherent coating etc. including cost of loading & unloading at road side stakicng ibn measurable stack as diected bvy the deptt. including payment of forest royalt and sale tax etc. 16.26 labour for spreading metal gravel / granular material on the road surface as directed including dressing and camering the formation and utilizing the loose earth in filling the depression as directed including cxarriage of gravel with 30m.
Sector: District Administration