Details: 1. cost for const. of boulder pitching3.4 construction of embankment with material obtained from borrow pits construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required and comp g actin to meet requirement of tables 300.1 and 300.2 with a lead upto 1000 m as per technical specification clause 301.5 (i) private land 3.12 furnishing and laying of the live sods of perennial turf forming grass on embankment , verges or other locations shown on the drawing or as directed by the engineer including preparation of ground, fetching of sods and watering as per technical specification clause 309. 11.1 earthwork in excavation for structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excav
Sector: District Administration