Details: clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per technical specification clause 201. scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3.0m and lead upto 1000 m as per technical specification clause 301.4. excavation in cutting in soil by manual means with lead upto 50 mexcavation for roadway in soil using manual means for carrying of cut earth toembankment site with a lift upto 1.5 m and lead upto 50 m as per technicalspecification clause 302.3 (manual method should be adopted where machinescan not be deployed due to site condition) construction of embankment with approved mate
Sector: Road development