Details: construction of 1 no of r.c.c.slab culvert. earthwork in excavation for structure as per drawing and technical specification clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50m, excavation suitable material i. in ordinary soil (upto height 3.00m depth) pcc 1:3:6 in foundation (plain cc 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days).
Sector: District Administration