Details: earthwork in excavation for foundation of structures as per drawings and technical specifications , including setting out, construction of shoring and bracing, including dewatering and using machinery, removal of stumps and other deleterious matter, dressing of sides and bottom and back filling with approved material. i) in ordinary soil b. mechanical means. ii) depth up to 3.00 m (with dewatering) providing and laying cutting edge of mild steel weighing 40 kg per metre for well foundation complete as per drawing and technical specification. plain/reinforced cement concrete, in well foundation complete as per drawing and technical specification including steel shuttering formwork. (n) without plasticiser, a. well curb, (iv) rcc m35 grade, case ii -with batching plant, transit mixer and concrete pump plain/reinforced cement concrete, in well foundation complete as per drawing and technical specification including steel shuttering formwork. (n) without plasticiser, b. well steining,
Sector: Road development