Details: final survey carrying out block contour survey of the commanded area covering stream, , channel, road etc. and the whole area considering square block system and spot system and spot levels are to be within 30 m x 30 m for preparation of contour including clearing light jungles, chaining, holding staff, umbrella and compass lining etc. where required, complete as directed. supplying sal wooden peg of different sizes including pointing one end etc. complete as directed. supplying sal wooden hammer of of size 15 cm x 10 cm with 45 cm long & 5 cm wooden handle etc. complete as directed. boring and installation of tube well movement of drilling rig , tools & plants, accessories including drill pipes, casing pipes etc. to drilling site and back. boring of dtw of bore hole up to 450mm dia and up to a depth of 70 m or up to required depth by rc/dr drilling rig including supply and transportation of all required tools & plants, materials & labour to site to perform the job in complete as d
Sector: Irrigation