Details: sub heading 1 construction of embankment with approved material obtained from borrow pits with all lift upto 1.5m, transporting to site, spreading , grading to required and compacting to meet requirement to table 300.1 and 300.2 with a lead upto 1000m as per technical specification clause 301.5(i) private land collection of sand gravel containing 60% and 40% gravel at quarry free from disintegrated and flaky pieces vegetation and other deleterious matter and adherent coating etc., (rate including fr & st loading, unloading stacking in working site from nearest quarry as directed) labour for spreading metal gravel / sand gravel on the road surface as directed including dressing and cambering the formation and utilizing the loose earth in filling the depression as directed including carriage of gravel within 30 m providing signboard
Sector: District Administration