Details: distmantling demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of engineer-in-charge 15.7.4 in cement mortar earthwork earth work in excavation by mechanical means(hydraulic excavator)/manual means in foundation trenches or drains not exceeding 1.5 m in width or 10 sqm in plan including dressing of sides and ramming of bottoms , lift upto 1.5 m , including getting out of the excavated soil as directed , within a lead of 50 m . 2.8.1 all kinds of soil pcc providing and layingin position cement concrete of specified grade excluding the cost of centering and shuttering-all works upto plinth level 4.1.5 1:3:6 (1 cement : 3 coarse sand(zone-iii) : 6 grad
Sector: Urban Authority