Details: 15.3:demolishing rcc work manually by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of engineer-in-charge. 15.5:extra for cutting reinforcement bars manually by mechanical means in rcc or rb work (payment shall be made on the cross section area of rcc or rb work) as per direction of engineer-in-charge. 2.8:earthwork in excavation work by mechanical means (hydraulic excavator)/manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms , lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m. 2.8.1 all kinds of soil 11.2:dry brick on edge flooring in required pattern with bricks of class designation 7.5 on a bed of 12 mm mud mortar, including filling joints with jamuna sand, with common burnt clay non modular bricks. 4.1:providing and laying
Sector: Urban Authority