Description: Work of Day to day shifting and installation of pumps at LK Zone LK1 LK2 and LK3 of Gevra project for a period of 365 days Name of the Work Contract No
Details: Loading, unloading, transportation and stacking/ placement of 12” MS pipes of different sizes as per the instructions of Engineer In charge. (For transportation of pipe, departmental vehicle will be provided) Loading, unloading, transportation and stacking/ placement of 10” MS pipes of different sizes as per the instructions of Engineer In charge. (For transportation of pipe, departmental vehicle will be provided) Loading, unloading, transportation and stacking/ placement of 8” MS pipes of different sizes as per the instructions of Engineer In charge.(For transportation of pipe, departmental vehicle will be provided) Laying and jointing of 12” MS Pipeline including loading & unloading transportation and placement, welding of pipes & cutting and fitting of Packing. (if jointing by Nut-bolt).(Gas, Welding electrodes, and Welding Machine will be supplied by contractor) (For transportation of pipe, departmental vehicle will be provided) Laying and jointing of 10” MS Pipeline including l
Sector: Mining