Description: Shifting diversion and re arrangement of existing pipeline ranges of LK 1 LK 2E LK 2W Old Dipka quarry sump and laying and jointing of 02 nos new pipeline ranges for dewatering activities of Old Dipka quarry at Dipka Expansion Project Name of the Work Contract No
Details: Dismantling of MS pipeline including shifting from site to loading point, loading, unloading, transportation and placement as per instruction of Engineer In-charge Size: 200mm dia. Size: 250mm dia. Size: 300mm dia. Dismantling and shifting of pump motor set from bed plates including foot valves, bends, short pieces, non-return valves, sluice valves, jetting hoses and delivery pipe etc. Installation of pump-motor set on bed plates including dismantling and refitting of foot valves, bends, short pieces, non-return valves, sluice valves, jetting hoses, suction and delivery pipes etc. Laying and jointing of MS pipeline including loading and unloading (within unit/ project), transportation and placement, welding of pipes and cutting and fitting of packing (if jointing by nut-bolt) Size: 200mm dia. Size: 250mm dia. Size: 300mm dia. Making of bends of different sizes. Size: 300mm dia. Size: 250mm dia. Fitting of Sluice Valves of different sizes Size: 300mm dia. Size: 250mm dia. Fitting of Non
Sector: Mining