Details: civil work [(1) construction of compound wall with gate & (2) construction of canteen at cane yard] - (2023-24) description(1) construction of compound wall with gateearth work in excavation at all depths by mechanical means in all kinds of soil hydraulic excavator)/manual means in foundation trenches or drains, including dressing of sides and ramming of bottoms, including getting out the excavated soil and desposal of surplus excavaed soil as deirected.filling avaibale excavated earth (excluding rock) in sides of foundations up to plinth in layers not exceedeig 20cm in depth, compacting each deposited layer by ramaing after watering with lead up to 0m to the lift up to 1.5m including cost of all materials, labour complete as per specifications.providing and laying in position cement concrete of specified grade excluding the cost of centering and shutting all work up to plinth 1:3:6 (1 cement: 3 fine sand: 6 graded stone aggregate 40mm nominal size), with all leads and lifts and
Sector: Sugar