Description: Construction and Up gradation to Two lane with paved shoulder In km 105 330 to 112 500 total length 7 170 km Kutul to Nilangur Maharashtra Border Road of NH 130D PKG 4 PART 3 in the State of Chhattisgarh Name of Work Construction and Up gradation to Two lane with paved shoulder in Km 105 330 to 112 500 7 170 Km Kutul to Nilangur Maharashtra Border Road of NH 130D PKG 4 PART 3 in the State of Chhattisgarh
Details: Clearing and Grubbing Road Land .(Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soilnot exceeding 150 mm in thickness.)(ii) By Mechanical Meansby by DozerA. In area of light jungle Compacting Original GroundCase-I : Compacting original ground supporting embankment (Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Table 300-2 for embankment construction.) as per clause 305.3.4. Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 metres. (Excavation for roa
Sector: Road development