Details: clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 meters including removal and disposal of top organic soil not exceeding 150 mm in thickness if required and as per relevant clauses of section-200. (a) in area of light jungle (b) in area of thorny jungle excavation in hard rock (controlled blasting) with disposal upto 1000 meters (excavation for roadway in hard rock with controlled blasting by drilling, blasting and breaking, trimming of bottom and side slopes in accordance with requirements of lines, grades and cross sections, loading and disposal of cut road with in all lifts and leads up to 1000 meters as per relevant clauses of section 300. construction of embankment / sub grade with material obtained from borrow pits (construction of emban
Sector: Road development