Details: (strengthening of road from salsud to dibadih (length-1.50 km.)) dismantling of flexible pavements dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately by manual means granular courses clearing grass and removal of up to a distance of 50 metres outside the periphery of the area by manual means clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, sapling and tress girth upto 300 mm, removal of stumps of tree cut earlier and disposal of unserviceable materials and stacking of sericeable material to be used of auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150mm in thickness. by manual means:- in area of light jungle construction of subgrade and earthen shoulders construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with approved material obtain
Sector: RDPR