Details: excavation for strucutres earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. mechanical means depth upto 3 m rcd sor - 12.01 b(i) excavation for strucutres earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. ordinary rock ( not requiring blasting) mechanical means rcd sor - 12.01 (ii) b excavation for strucutres earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and b
Sector: Road development