Details: 1. pwd road to margo via triconi kesotlki clearing grass and removal of up to a distance of 50 metres outside the periphery of the area as per technical specification clause 201. scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with in all lifts and lead upto 1000 metres. construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required and compacting to meet requirement of table 300-2. wet mix macadam (providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at omc in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface an
Sector: RDPR