Details: (strengthening of road from bala to gorhapa via sosokuti (length-0.65 km.)) clearing grass and removal of up to a distance of 50 metres outside the periphery of the area by manual means construction of subgrade and earthen shoulders construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required and compacting to meet requirement of table 300-2. cement concrete pavement construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per clause 1501.2.2 m30 (grade), coarse and fine aggregates conforming to is:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 capacity and appropriate weigh batcher using approved mix design
Sector: RDPR