Details: 01) strengthening of road from hudu to tumsa. (length: 4.20 k.m.) clearing grass and removal of up to a distance of 50 metres outside the periphery of the area. construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required and compacting to meet requirement of table 300-2. scarifying the existing bituminous surface to a depth of 50 mm and disposal of scarified material within all the lifts and leads upto 1000 metres. by mechanaical means using hydraulic excavator. providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at omc in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the d
Sector: RDPR