Details: (i) basuara village (l- 1.000 km.)clearing grass and removal of up to a distance of 30 m outside the periphery of the area as per technical specification clause 201 scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with in all lifts and lead upto 1000 metres.by mechanaical means using hydraulic excavator. dismantling of cement concrete pavements (dismantling of cement concrete pavement by mechanical means using pneumatic tools, breaking to pieces not exceeding 0.02 in volume and stock piling at designated locations and disposal of dismantled materials up to a alead of 1000 metres, stackiung serviceable and unserviceable materials separately) construction of subgrade and earthen shoulders (construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required and compacted to meet requirement of table no. 300-2) excavation in s
Sector: RDPR