Details: earth work in excavation in foundation trenches and disposal of excavated earth as obtained to a distance upto 50 m including all lift, leveling ramming the foundation trenches, removing roots of tree shrubs all complete as per approved design, building specification and direction of e/i upto 1.50 m depth (amount with total quantity) extra for earth work in hard soil as per specification and direction of e/i. (vide classfication of soil item - b) filling in foundation trenches and plinth in layer not exceeding 150mm thick will watered rammed fully compacted and fine dressed with earth obtained from excavation of foundation trenched with a lead of 50mm and lift of 1.5m all complete as per building specification and direction of e/i. (mode of measure
Sector: Zilla Parishad