Description: Construction of Unity Mall PM Ekta Mall at Core Capital Area at Site 1 HEC area Ranchi Jharkhand Name of Work CONSTRUCTION OF UNITY MALL G 6 WITJ BASEMENT AT CORE CAPITAL AREA SITE I HEC AREA RANCHI INCLUDING WATER SUPPLY SANITARY SYSTEM FURNITURE WORK ELECTRICAL INSTALLATIONS FIRE FIGHTING SYSTEM FIRE ALARM PROVISION OF LIFTS CENTRAL AIR CONDITIONING SYSTEM SUBSTATION EQUIPMENTS D G SET OF ADEQUATE CAPACITY CCTV SYSTEMS SOLAR PHOTOVOLTAIC POWER GENERATION SYSTEM ACCESS CONTROL SYSTEM LAN SYSTEM STP ETP PLANT BAGGAGE SCANNER DOOR FRAME METAL DETECTOR PROVISION OF ESCALATOR SITE DEVELOPMENT WORK INCLUDING HORTICULTURES
Details: EARTH WORK Earthwork in excavation in foundation trenches in ordinary soil (vide classification of soil item-A) and disposal of excavated earth as obtained to a distance upto 50 M. including all lifts, levelling, ramming the foudation trenches, removing roots of trees, shrubs all complete as per approved design, building specification and direction of E/l. Extra rates for quantities of works, executed : In or under water and/or liquid mud, including pumping out water as required. Earth filling in foundation trenches and plinth in layers not exceeding 150 mm. thick well watered, rammed, fully compacted and fine dressed with earth obtained from excavation of foundation frenches within a lead of 50 M. and lift of 1.5 M all complete as per building specification and direction
Sector: Industry Development