Details: earth work in excavation earth work in excavation of foundation of strycture as per drawing and technical specification, including setting out, consruction of shoring and bracing removal of stumps and other deleterious matter, dressing of sides and bottom and backling with approved materal providing p.c.c.m10 with nominal mix (1:3:6) in foundation with crushed stone aggregate 40mm nominal size mechnically mixed placed in foundation and compacted by vibration including curing for 14 days providing r.c.c.m20 in substructure with crushed stone aggregate 40mm nominal size mechnically mixed placed in foundation and compacted by vibration including curing for 14 days base slab side wall base slab side wall. providing r.c.c.m30 in superstructure with crushed stone aggregate 40mm nominal size mechnically mixed placed in foundation and compacted by vibration including curing for 14 days cover. supplying, fitting, and placing hysd bar reinforcement in substructure complete as per drawing and te
Sector: Industry Development