Details: civil work dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead. for thickness of tiles above 25 mm and up to 40 mm dismantling aluminium/ gypsum partitions, doors, windows, fixed glazing and false ceiling including disposal of unserviceable material and stacking of serviceable material with in 50 meters lead as directed by engineer-in-charge dismantling stone slab flooring laid in cement mortar including stacking of serviceable material and disposal of unserviceable material within 50 metres lead. dismantling of flushing cistern of all types (c.i./pvc/vitrious china) including stacking of useful materials near the site and disposal of unserviceable materials within 50 metres lead. dismantling g.i. pipes (external work) including excavation and refilling trenches after taking out the pipes, manually/ by mechanical means ncluding stacking of pipes within 50 metres lead as per direction of engineer-in-charge :15 mm to 40 mm nom
Sector: Zilla Parishad