Details: clearing and grubbing road land (clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness.vide rcd sor- 2.03 (i) b dismantling of structures (dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including t&p rand scaffolding wherever necessary, sorting the dismantled b material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres). dismantling brick / tile work to cement mortar. vide rcd sor- 2.04 (i) b dismantling of structures (dismantling of existing structures like culverts, bridges, retaining wal
Sector: Road development