Description: Construction of Boundary Wall 05 at I R B 9 Giridih in the district of Giridih Name of Work Construction of Boundary Wall 05 at I R B 9 Giridih in the district of Giridih
Details: Building Works 5.1.1Earth work in excavation in foundation trenches in ordinary soil (vide classification of soil item A) and disposal of excavated earth as obtained to a distance upto 50M including all lifts leveling ramming the foundation treanches, removing roots of trees, and shrubs all complete as per approved design, building specification and direction of E/I. 2.7.3 D.S.REarth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge. Hard rock (blasting prohibited) 5.1.10Providing coarse clean sand in filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including cost of all materials labour, royalty and taxes all complete as per building specification and direction of E/I (Mode
Sector: Police and Internal Security