Details: dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead for thickness of tiles above 25 mm and up to 40 mm dismantling aluminium/ gypsum partitions, doors, windows, fixed glazing and false ceiling including disposal of unserviceable material and stacking of serviceable material with in 50 meters lead as directed by engineer-in-charge extra for cutting reinforcement bars manually/ by mechanical means in r.c.c. or r.b. work (payment shall be made on the cross sectional area of r.c.c. or r.b. work) as per direction of engineerin-charge. reinforced cement concrete work in beams, suspended floors, roofs having up to 15 degree landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases, above plinth level upto floor five level, excluding the cost of cenetering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand (zone - iii): 3 graded stone aggregate 20
Sector: Zilla Parishad