Description: CONSTRUCTION OF C D WORK AT CH 1133 1128 OF PMC UNDER PUNASI RESERVOIR SCHEME Name of Work CONSTRUCTION OF C D WORK AT CH 1133 1128 OF PMC UNDER PUNASI RESERVOIR SCHEME
Details: Earthwork in excavation of foundation trenches in ordinary soil (vide classification of soil item - A) and disposal of excavated earth so obtained a distance upto 50M and average lift of 1.5M including levelling, ramming the foundation trenches removing the roots or shrubs etc. all complete as per specification and direction of E/I 7.1.27 Extra for earth work in hard soil (Vide classification of soil item -B ) ll complete as per specification and direction of E/I. 7.1.10 Earthwork in excavation in canal by the hydraulic excavator ( rock breaker) as per designed section in soft rock ( where blasting is prohibited) vide type of soil item-c with disposal of spoil up to 500 M with all lifts by tipper including construction and maintenance of haul road all complete as specification and direction of E/I. 7.1.43.8. PCC 1:3:6 in foundation (plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregates 40mm nominal size mechanically mixed , placed in foundation and compac
Sector: Water Resource Department