Details: details earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required a nd utilising the remaining earth locally for road work.ordinary soil mechanical means.s.o.r. item no. 3.13 (i) b plain/reinforced cement concrete in open foundation complete as per drawing and technical specifications (p.c.c. grade m-15) s.o.r. item no. 12.08 a case-ii providing and laying of dry rubble flooring complete as per drawings and technical specifications clause 2506 s.o.r. item no. 16.09 plain/reinforced cement concrete in sub-structure complete as per drawing and technical specifications (p.c.c. grade m-20) s.o.r. item no. 13.05 b (p) furnishing and placing reinforced/ prestressed cement concrete in sub-structure as per drawing and technical specification (r.c.c. grade m-25 in d
Sector: RDPR