Details: earthwork in excavation in foundation trenches in ordinary soil (vide classification of soil item - a) and desposal of excavated earth as obtained to a distance upto 50 m including all lifts, leveling, ramming the foundation trenches, removing roots of trees shurbs all complete as per approved design, building specification and direction of e/i. construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at omc, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. for grading-(i) material providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - all work upto plinth level: 1:2:4 (1 cement : 2 coarse sand (zone- iii) : 4 graded stone aggregate 20 mm nominal size) filling in foundation trenc
Sector: Urban Authority