Details: road boundry fencing earthwork in excavation in foundation trenches in ordinary soil (vide classification of soil item-a) and disposal of excavated earth as obtained to a distance upto 50 m. including all lifts, levelling, ramming the foudation trenches, removing roots of trees, shrubs all complete as per approved design,building specification and direction of e/l. earth filling in foundation trenches and plinth in layers not exceeding 150 mm. thick well watered, rammed, fully compacted and fine dressed with earth obtained from excavation of foundation frenches within a lead of 50 m. and lift of 1.5 m all complete as per building specification and direction of e/l (mode of measurement compacted volume). providing designation 75 a one brick flat soling joints filled with local sand including cost of watering taxes royalty all complete as per buildingspecification and direction of e/l. providing p.c.c. m - 150 with nominal mix of (1:2:4) in foundation with approved quality of ston
Sector: Urban Authority