Details: providing ordinary labours engaged for site clearance, bush clearance etc.(b.c.d p-93,item no. 1) earth work in excavation in foundation trenches in ordinary soil ( vide classification of soil item – a ) and disposal of excavated earth as obtained to a distance upto 50 m including all lifts, leveling, ramming the foundation trenches,removing roots of trees,shrubs all complete as per specification and direction of e/i. ( b.c.d 5.1.1) extra for earth work in hard soil as per specification and direction of e/i (vide classification of soil item b) ( b.c.d 5.1.2) providing and laying in position cement concrete of specified grade 1:3:6(1 cement : 3 coarse sand (zone-iii) : 6 graded stone aggregate 40 mm nominal size)excludind the cost of centering and shuttering-all works up to plinth level ( b.c.d 5.3.1.5) providing and laying in position cement concrete of specified grade 1:1.5:3(1 cement : 1.5 coarse sand (zone-iii) : 3 graded stone aggregate 20 mm
Sector: Water Resource Department