Details: earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.(ordinary soil - manual means). sand filling in foundation trenches as per drawing & technical specification plain/reinforced cement concrete in open foundation complete as per drawing and technical specifications.(pcc m15) rcc grade m20 using batching plant, transit mixer & concrete pump plain/reinforced cement concrete in super-structure complete as per drawing and technical specifications. rcc m-30 supplying, fitting and placing hysd bar reinforcement in sub structure complete as per drawing and technical specifications. removal of unserviceable soil including excavation, loading and disposal upto 1000 metres lead but excluding replacement by suitable soil which shall be paid separately as per clause 305. dismantli
Sector: Road development