Details: labour for cleaning the work site before and after work etc. labour for site clearence before and after the work etc. providing and applying tack coat with bitumen emulsion using pressure distributor at the rate of 0.20kg/sqm on the prepared bituminious/granular surface cleaned with mechanical broom. providing and applying tack coat with bitumen emulsion using pressure distributor at the rate of 0.30kg/sqm on the prepared bituminious/granular surface cleaned with mechanical broom. providing and laying bituminous macadam with 100-120 tph hot mix plant producing an average output of 75 tonnes per hour using crushed aggregatate all as per specification and direction of e/i. bituminous concrete grading (i) with vg-30 grade packed bitumen (providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading premixed with bituminous binder @ 5.2 % of mix and filler, transporting the hot mix to work site, laying with a hydrostat
Sector: Urban Authority