Details: earthwork in excavation in foundation in ordinary soil and disposal of excavated earth as obtained to a distance upto 50m including all lifts, levelling, ramming the foundation trenches, removing roots of trees, shrubs all complete as per approved design building specification and direction of e/i [5.1.1+5.1.2] disposal of excavated earth in borrow area of lead 1km(k) +2km(p) ( add 50% extra for loose volume) construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at omc and compacting with vibratory roller to achieve the desired density complete as per clause 4.01. providing pcc m-20 in nominal mix of (1:1.5:3) in foundation with approved quality of stone-do--- [5.3.1.1] providing shuttring for casting of pcc do e/1.[5.3.17.1] construction of sub-grade and earthen shoulder with approved materials obtained from borrow pits with all its leads, trasport
Sector: Urban Authority