Details: earthwork in excavation in foundation in ordinary soil and disposal of excavated earth as obtained to a distance upto 50m including all lifts, levelling, ramming the foundation trenches, removing roots of trees, shrubs all complete as per approved design building specification and direction of e/i [5.1.1+5.1.2] providing course clean sand in filling in foundation tranches or in plinth including ramming and watering in layer not exceeding 150 mm thick with all leads and lifts including cost of all materials, labour, royalty and taxes all complete as per building a specification and direction of e/i.[5.1.10] providing and laying factory made chamfered edge cement concrete paver blocks in footpath, parks, lawns, drive ways or light traffic parking etc, of required strength, thickness & size/ shape, made by table vibratory method using pu mould, laid in required colour & do 4 pattern over 50mm thick compacted bed of sand, do complete all as per direction of engineer-in-charge 80 mm thick
Sector: Urban Authority