Details: a. water supply & sanitation ( toilets and ) jungal clearence including weeding out shrubs and small trees up to 150 mm dia girth and there removalas per specification and direction of e/i. jh sor 7.1.3 part a 2.02 dismantling patent stone flooring including stacking serviceable materials in countable stacks within 15 m lead and disposal of unserviceable materials with all leads all complete as per direction of e/i. bcd 5.10.04 providing 25 mm thick first class patent stone flooring (1:2:4) with stone chips,in two layers, bottom layer 19 mm thick (1:2:4) with 12 mm to 6 mm size graded stone chips and top layer 6 mm thick (1:2) with 6 mm down stone chips in panels,including cost of curing, finishing the surface smooth by rubbing with carborun-dum stone,taxes and royalty all complete as per building specification and direction of e/i. bcd 5.6.7 providing and laying 6mm . precast white glazed tiles in walls over 12mm cement mortar (1:3) and jointed white grey cement slurry flush
Sector: Water supply and Sewerage